Sixthells, Ictearz's 'Critical Path' came out on July 2, 2021. Critical Path is 2 minutes and 7 seconds long and may contain bad words that may be unsuitable for children. The song is number 7 out of 12 in Devil's Way by Sixthells. In terms of popularity, Critical Path is currently not that popular. Although the overall vibe is very danceable, it does project more negative sounds.
The tempo marking of Critical Path by Sixthells, Ictearz is Andante (at a walking pace), since this song has a tempo of 95 テンポ. With that information, we can conclude that the song has a slow tempo. This song can go great with yoga or pilates. The time signature for this track is 4/4.
This song has a musical key of F♯ Major. This also means that this song has a camelot key of 2B. So, the perfect camelot match for 2B would be either 2B or 3A. While, 3B can give you a low energy boost. For moderate energy boost, you would use 11B and a high energy boost can either be 4B or 9B. Though, if you want a low energy drop, you should looking for songs with either a camelot key of 2A or 1B will give you a low energy drop, 5B would be a moderate one, and 12B or 7B would be a high energy drop. Lastly, 11A allows you to change the mood.
Track | Artist | Key | Energy | Camelot | BPM | ||
---|---|---|---|---|---|---|---|
go back home. | YvngHomieRyan | D♭ Major | 7 | 3B | 113 BPM | ||
TONIGHT THEY PRAY | Yelsisdead | D♭ Major | 4 | 3B | 60 BPM | ||
Lifeline | Scar$, Robstar | F♯ Minor | 5 | 11A | 120 BPM | ||
Shredding | Robstar, Shiki XO | D♭ Major | 8 | 3B | 84 BPM | ||
Grasp of the soul | emjaay | D Major | 5 | 10B | 150 BPM | ||
You Look Like Kennedy | Santos Santana | D♭ Major | 6 | 3B | 160 BPM | ||
Hang With Demons They My Friends | Sixthells | F♯ Minor | 8 | 11A | 140 BPM | ||
Fukkit | Ictearz | A Minor | 3 | 8A | 81 BPM | ||
Changes | Lil Tytan | B Major | 9 | 1B | 95 BPM | ||
Lex Talionis | Drear | D♭ Major | 8 | 3B | 130 BPM |