"Critical Path Method" by Ontal was released on April 27, 2018. Critical Path Method is about six minutes long, preciously at 6:03, making this song fairly long compared to other songs. The song is number 6 out of 13 in Afflux 2014-2018 by Ontal. Based on our statistics, Critical Path Method's popularity is not that popular right now. Although the tone can be danceable to some, this track does projects more of a negative sound rather than a postive one.
The tempo marking of Critical Path Method by Ontal is Allegro (fast, quick, and bright), since this song has a tempo of 126 BPM. With that information, we can conclude that the song has a fast tempo. This song can go great with walking. The time signature for this track is 4/4.
This song has a musical key of D Major. This also means that this song has a camelot key of 10B. So, the perfect camelot match for 10B would be either 10B or 11A. While, 11B can give you a low energy boost. For moderate energy boost, you would use 7B and a high energy boost can either be 12B or 5B. Though, if you want a low energy drop, you should looking for songs with either a camelot key of 10A or 9B will give you a low energy drop, 1B would be a moderate one, and 8B or 3B would be a high energy drop. Lastly, 7A allows you to change the mood.
Track | Artist | Key | Energy | Camelot | BPM | ||
---|---|---|---|---|---|---|---|
Another Day in Dreamworld | Dimensionhopper | D Major | 9 | 10B | 150 BPM | ||
1018818 | Kobosil | B♭ Major | 7 | 6B | 159 BPM | ||
Underrated Chimes | R4W&L00PZ | E Minor | 8 | 9A | 123 BPM | ||
Uprock | Ontal | B Minor | 10 | 10A | 130 BPM | ||
Critical Incident | Umwelt | G Major | 10 | 9B | 130 BPM | ||
Biomatric | Panda Techno, Panda Dance, Panda Music | F♯ Major | 9 | 2B | 140 BPM | ||
Aggregate | Kobosil | B♭ Minor | 9 | 3A | 125 BPM | ||
Shock - Unhuman Remix | Ontal, 2nd Gen, Unhuman | B♭ Minor | 7 | 3A | 127 BPM | ||
Scenario | Dettmann, Klock | E Minor | 6 | 9A | 127 BPM | ||
Balmain - Original Mix | Rorganic | B Major | 7 | 1B | 140 BPM |
Section: 0.4875326156616211
End: 0.4936542510986328